Invastor logo
No products in cart
No products in cart

Ai Content Generator

Ai Picture

Tell Your Story

My profile picture
image number 0

LRT-1 Cavite Extension Set to Open This November: A Game-Changer for Commuters!

3 months ago
8

LRT-1 Cavite Extension Set to Open This November: A Game-Changer for Commuters!

The long-awaited Phase 1 of the LRT-1 Cavite extension will enhance connectivity and reduce travel times for thousands of passengers.

Philippine Headlines /

The bustling metropolis of Manila is set to witness a significant transportation milestone with the upcoming opening of the Cavite extension of the Lightweight Railway Transit Line 1 (LRT-1) in November 2024. This extension has been in the works for years, facing numerous delays primarily due to right-of-way issues. Now, with the first phase completed, the extension promises to transform the commuting experience for residents of Parañaque, Pasay, and Cavite. As urban congestion continues to plague these areas, this development is not just timely but essential for improving mobility and reducing traffic woes.

--- A Closer Look at the Extension The Cavite extension consists of five new stations stretching approximately six kilometers from Baclaran to Sucat. This addition will significantly enhance the existing 20-kilometer LRT-1 network, allowing for seamless travel across the metro. Enrico Benipayo, president of Light Rail Manila Corp. (LRMC), emphasized the importance of this expansion, stating that it will reduce travel time across the line to less than an hour—an invaluable benefit for daily commuters. Fare Structure and Capacity Despite the added distance, the fare per kilometer will remain unchanged, although there will be an incremental increase based on the extended route. The total fare for a full stretch of LRT-1 is projected to be around P45. With the introduction of 30 additional coaches, 19 of which will be operational this November, the LRT-1 is set to accommodate an extra 80,000 passengers daily. This increase in capacity is crucial, given that the current average ridership stands at 323,000 passengers per day. Traffic Reduction and Time Savings Transportation Secretary Jaime Bautista expressed optimism that the LRT-1 extension will help alleviate traffic congestion in Parañaque and Pasay, ultimately saving commuters both time and money. The Department of Transportation (DOTr) estimates that the extension could reduce travel time by at least 30 minutes, a significant improvement for those navigating the often-chaotic streets of Metro Manila. ---

“The operations of LRT-1 extension will be part of Parañaque and Pasay that will benefit, there will be some reduction in traffic,” said Secretary Bautista during a recent press briefing. “We hope that this will lead to a more efficient commuting experience for our passengers.”

---

The opening of the LRT-1 Cavite extension marks a pivotal moment for the Manila metropolitan area, providing a much-needed solution to the ongoing transportation challenges. With its completion, commuters can look forward to shorter travel times, reduced congestion, and increased capacity on one of the city’s most vital transit lines. As we inch closer to the launch date this November, the anticipation among residents and commuters alike continues to grow, promising a brighter, more connected future for the region.


User Comments

Related Posts

    There are no more blogs to show

    © 2025 Invastor. All Rights Reserved